Well, we’re post-Oshkosh yet again, which is like caffeine to a homebuilder, and the flurry of work that it inspired has begun to settle back into the usual workman-like rhythm of the last 3 years. Thanks to the members of EAA974, the Cozy Grrrrlllls, Andy Millin, Rich Guerra, Keith Hallsten, and everybody else that made this trip so fun and a lot like home on the road! Since last update, we’ve connected the engine throttle and mixture controls, received the engine hoses, and installed the ELT. Also, I’m about 80% done with the installation of the rear cabin (false) bulkhead. Oh, and we’ve been looking into moving the plane to the airport, and have found it very difficult to find someone willing to move the wide-load of our airplane. Most towing services won’t even talk to us, but I think we’ve got a solid lead. Stay tuned.
Posted By: Brett FerrellTuesday August 23rd, 2005 at 9:50 PM