Pitot Tube and Static Ports Installed, Canard Cover attached and faired (including the novella “what I did with my Thanksgiving Holiday), Engine installation kit ordered, in finally engine negotiations, and fuel gauge legends ordered, Instrument Panel fitted, speed brake limit switch installed and Seat Belt Hard Points installed.

Posted By: Brett Ferrell
Tuesday December 2nd, 2003 at 5:43 PM

Categories: Blog
Tags: Blog

Please Login to Comment.