Spinner work completed (for now, it’ll need final paint with everything else later), radio trays installed and intercomm and transponder mounted-wiring beginning, and still chasing various engine bugs preparing for first run. Wing-root fire protection installed, ailerons installed, rudders/cables installed, more engine connection work, brakes bled (again). Additional pictures in plane-to-airport section from the Brainards.
Posted By: Brett FerrellSunday May 28th, 2006 at 7:43 PM