Installing Upper Strake Half
Before installing the upper strake half, all of the interior surfaces are covered with Jeffco Fuel sealant. And the fuel intake screen is installed. Next the bulkheads and baffles have a significant (about 1/4″) mound of Jeffco and flox spread on them top stake skin is carefully set in place, with the ground wire exiting […]
Read More