[Picture Album] 2009 Airventure & Velocity BBQ

[Picture Album] 2009 Airventure & Velocity BBQ

Click on the thumbnail for a bigger picture Jerry Brianard on Grill – Velocity BBQ Carlos and Marcy Fernandez – Velocity BBQ Don and Lynn Johnston – Velocity BBQ Velocity BBQ Andy Millin – Velocity BBQ Travis McQueen and Dianne Lindbergh – Velocity BBQ Velocity BBQ Heather and Denise Osterhouse – Velocity BBQ Dave Nelson, […]

Read More

Departing for Oshkosh 2009

Last update before Oshkosh (we’re heading out Friday evening for early Saturday setup)! We’re looking forward to catching up with all of our EAA friends, and especially the canardians. I hope that everyone can make the Velocity BBQ on Wednesday and our Early Bird pasta feast on Tuesday! So, we’ve made a lot of progress on the pants, and I […]

Read More

Preparing for Oshkosh 2009

You’ll probably be seeing more posts here in the next week as we frantically try to finish work items before Oshkosh. Last night I finished installing the OAT probe for the GRT EIS, so the only work left there is to connect the “pull-up” resistors, program the screens and the EIS, and mount and provision […]

Read More
Reiff Preheater Delivery

Reiff Preheater Delivery

We’ll start installing the Reiff preheat system once the cowling work is done. Here you can see we’ve purchased the turbo XL version. Reiff preheater system (turbo XL)   For formatting only Lorem ipsum dolor sit amet, consectetur adipisci elit, sed eiusmod tempor incidunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrum […]

Read More
Mounting EIS Outside Temperature Probe

Mounting EIS Outside Temperature Probe

Here you can see that I’ve drilled a hole for the EIS Outside Air Temperature probe, and the fuselage was too thick for the nut to hold it on. I removed the inner skin and foam, shaped it, and laid 4 BID in the recess. After curing, I drilled the hole back out and installed […]

Read More
Door Pin Covers, Part I

Door Pin Covers, Part I

December, 2009 Here we’re finally installing the door cover panels. Since we’re going to be looking to have the upholstery installed this spring we need to finalize some of these details so they can do their work. Here we’ve used structural epoxy to mount the attach points, which were previously made (see below). Because of […]

Read More
1 132 133 134 135 136 225