The runner modifications are nearly done now, the hinges are on to mate the two halves together, and the stubs are firmly bonded to the fuselage. The only thing remaining is to add the new ducts for the engine and oil cooler on the side of the runners.
![]() Forming the duct |
![]() glassed extensions |
![]() Runner stub glassed on the NACA |
![]() Hinge installation |
![]() Hinge Installation |
Posted By: Brett FerrellFriday October 9th, 2009 at 10:34 PM
Categories: Cooling NACA and Cooling Plenum Tags: Building Cooling Fuselage NACA