The runner modifications are nearly done now, the hinges are on to mate the two halves together, and the stubs are firmly bonded to the fuselage. The only thing remaining is to add the new ducts for the engine and oil cooler on the side of the runners.

Forming the duct

glassed extensions

Runner stub glassed on the NACA

Hinge installation

Hinge Installation

Posted By: Brett Ferrell
Friday October 9th, 2009 at 10:34 PM

Categories: Cooling NACA and Cooling Plenum
Tags: Building Cooling Fuselage NACA

Please Login to Comment.